Blog

Mountain Vale Climate Ready trial site all planted!

The Climate Ready trial planting at Mountain Vale near Murrumbateman was completed in April with a workforce of 20 enthusiastic and capable volunteers who dug holes, watered, and put guards on for a total of 552 plants. The layout of this site is provided in this link. Many hands made light work.  You will hear more about this climate ready site and the Kangiara trial site over the coming years as to how the local and admix plants thrive or die in those sites.

Here are some important lessons from the day (thanks Geoff!):

We have the 10 great buckets from Bowning Bookham. Each bucket labeled A or L  and I've cut frames to hold 8 tubes in each bucket. ie 4 acacia plus 4 hop bush. We have enough people coming to have two teams of two on these and one team of two finishing the eucs ahead of them. I'm keen to avoid people having to bend over too much so the bucket system will be better and easier than putting tubes on the ground at each spot. 

I've also got a container that fits on my belt that holds 8 so that's an option as well. 

Another team of 2 or 3 to supervise and load the buckets and place the A or L buckets at the A or L marker posts and one team of two watering in and one or two teams doing guards. 

Correct and consistent planting and quick follow up with watering in will be the priority.  Guards after that.

Gill and I had a trial run with the guards and like you, we found the stakes a bit rough on corners and hard to easily put through holes in guards so I rotated them across my bench sander so hopefully they'll be easier.

 


Print  
Image

Follow on Facebook

Subscribe to our Newsletter

Sign up to receive Yass Area Network of Landcare Group's eNewsletters and announcements.